On the frame of the production hall, we have completed covering the roof structure with a membrane roofing system, and the sheet metal components of the building envelope have also been finalised. Work continues in the interior, including the installation of HVAC systems, electrical wiring, floor thermal insulation, and the building’s waterproofing. Concreting of the foundation slab for the administrative building has also begun.