In Humenné, we carried out an extension of the warehouse to an existing shopping center. The building has a built-up area of 109.5 square meters, with a load-bearing structure made of a steel frame consisting of columns and trusses. The steel structure of the building, from design to final execution, was completed by our branch in Spišské Podhradie.









