Take a behind-the-scenes look at the construction progress of the project for Andritz Slovakia s.r.o.
In Humenné, work in the main hall of the building currently includes assembling the roof structure, installing plumbing systems, and mounting steel structures. In the administrative building, we are installing the horizontal sewer system and tying reinforcement for the concrete topping on the Spiroll floor slabs.



