Reconstruction of Cooling System – Billa Regional Warehouse
Completed.
Petrovany
In the Billa regional warehouse in Petrovany, we carried out the replacement of the cooling system. As part of the replacement, we also carried out the reconstruction of the premises housing the technologies, which, after demolition works, received new construction modifications.
COOLING SYSTEM REPLACEMENT AT THE BILLA REGIONAL WAREHOUSE COMPLETED!
| 28. 07. 2024
COOLING SYSTEM REPLACEMENT IS PROGRESSING.
After completing the installation of a special floor resistant to ammonia, new chillers were transported into the engine room through an open facade. We have finished the roof access, where an additional condenser has also been installed, and we are continuing with the implementation of fire penetrations.
| 18. 04. 2024

| 27. 03. 2024
WE ARE REMOVING THE OLD COOLING TECHNOLOGY.
The premises housing the technology are undergoing a layout change – demolition works are being carried out, followed by the installation of new partitions. The old cooling technology is being removed and will be replaced with a new system. For the needs of the new cooling installation, steel structures are being constructed, which we are manufacturing in-house at our branch in Spišské Podhradie.